East Side Access Progress Photos

QUEENS WORK

1. Installation of bracing struts for an approach structure located in Harold Interlocking.

East Side Access 05-31-19

2. Pouring concrete for an underpinning pit under the 39th Street Bridge for the final track approach structure.

East Side Access 05-31-19

3. Building a turnout for the Mid-day storage yard west of Honeywell Ave.

East Side Access 05-31-19

4. Installing the inner casing for a mini pile east of the 39th Street Bridge in Harold Interlocking.

East Side Access 05-31-19

5. Reconfiguring, identifying and installing control wires in a SCADA cabinet at a power substation in Queens.

East Side Access 05-31-19

6. Performing tests on the newly installed and newly energized facility power systems in a power substation in Queens.

East Side Access 05-31-19

MANHATTAN WORK

7. Installing tunnel pipes along the track that accesses the new LIRR terminal.

East Side Access 05-31-19

8. Installing rebar reinforcement for the 47th Street entrance to the future LIRR Concourse.

East Side Access 05-31-19

For more information and images, please visit the East Side Access project page on AModernLI.com – http://www.amodernli.com/project/east-side-access/.