MANHATTAN WORK

East Side Access 06-21-191. Installation of ceiling racks on the lower track level in the west cavern of the future LIRR Terminal.

East Side Access 06-21-192. Grading and compacting soil at the north end of the back of house area of the future LIRR Concourse.

QUEENS WORK

East Side Access 06-21-193. Continued excavation of the final approach structure in Harold Interlocking.

East Side Access 06-21-194. Drilling a soldier pile with an auger rotary drill for a new approach structure in Harold Interlocking.

East Side Access 06-21-195. Placing sub-ballast (gravel) over a traction power duct bank in Harold Interlocking.

East Side Access 06-21-196. Performing underground cable relocation for a new tunnel approach structure in Harold Interlocking.

East Side Access 06-21-197. Installing insulator and pull-off assemblies on catenary wires poles in Harold Interlocking.