MANHATTAN WORK

East Side Access 06-14-191. Monument installation on the west side track of the Manhattan tunnels.

East Side Access 06-14-192. Track installation at the upper level crossover in the Manhattan tunnels.

QUEENS WORK

East Side Access 06-14-193. Installation of a 35-foot soldier pile for the B/C Approach Structure support of excavation.

East Side Access 06-14-194. Hand digging and extending conduits below ground for a switch in Harold Interlocking.

East Side Access 06-14-195. Burying cables along the trough line for the B/C Approach Structure.

East Side Access 06-14-196. Concrete forms to support a duct bank between tracks in the future Mid-day Storage Yard.

East Side Access 06-14-197. Placing flowfill to secure a soldier pile for the B/C Approach Structure support of excavation.

East Side Access 06-14-198. Sub-ballast installed east of Queens Boulevard.