Project Overview

The Rockville Centre Viaduct, built in 1941, is located in the Village of Rockville Centre in the Town of Hempstead and serves the Babylon Branch.  This viaduct is affiliated with the raised Rockville Centre Train Station. The Rockville Centre Viaduct will be rehabilitated and repaired, including improvements to the existing drainage system. This project is anticipated to commence in late 2018 and will be restored in conjunction with the Lynbrook Viaduct Rehabilitation.

MTA Board Approves Contract for Transformative LIRR Modernization

By | Accabonac Road Bridge and North Main Street Bridge, Baldwin Station, Bayside Station, Bellmore Station, Bellmore Substation, Brentwood Station, Buckram Road Bridge, Carle Place Station, Carle Place Substation, Cherry Lane Bridge, Cherry Valley Road Bridge, Covert Avenue Grade Crossing, Deer Park Station, Double Track, East Hampton Station, East Side Access, East Yaphank Station, Farmingdale Station, Floral Park Parking Re-Surfacing, Floral Park Station, Floral Park Substation, Flushing Main Street Bridge, Flushing Main Street Station, Glen Cove Bridge, Great Neck Station, Hicksville Parking, Hicksville Station, Hicksville Substation, Jamaica Capacity Improvements, LIRR Expansion Project, Lynbrook Viaduct, Main Street Grade Crossing, Meadowbrook Parkway Bridge, Meadowbrook Substation, Merillon Avenue Station, Merillon Avenue Substation, Merrick Station, Mid-Suffolk Train Storage Yard, Mineola Harrison Avenue Parking Structure, Mineola Main Street Parking, Mineola Second Street Parking, Mineola Station, Mineola Substation, Morris Park Diesel Locomotive Shop, Moynihan Train Hall, Murray Hill Station, Murray Hill Substation, Nassau Boulevard Bridge, New 33rd Street Corridor at Penn Station, New Cassel Substation, New Hyde Park Road Grade Crossing, New Hyde Park Road Surface Lot, New Hyde Park Station, New Hyde Park Substation, New M9 Rail Cars, Northport Station, Nostrand Avenue Station, Ocean Avenue Substation, Plainfield Avenue Bridge, Port Jefferson Station, Port Washington Substation, Positive Train Control, Post Avenue Bridge, Press Release, Project Update, Rockville Centre Viaduct, Ronkonkoma Station, Rosedale Substation, Sandy Substation Restoration, School Street Grade Crossing, South 12th Street Grade Crossing, South Tyson Avenue Bridge, Springfield Boulevard Bridge, Stewart Manor Station, Stony Brook Station, Syosset Station, Tanners Pond/Denton Avenue Bridge, Urban Avenue Grade Crossing, Valley Stream Station, Wantagh Station, Webster Avenue Bridge, Westbury North Parking Structure, Westbury South Parking Structure and LIRR Lot Development, Westbury Station, Westbury Substation, Willis Avenue Grade Crossing, Wreck Lead Bridge, Wyandanch Station
Historic Project Will Improve Railroad Infrastructure, Eliminate Seven Street-Level Railroad Crossings, Improve Railroad Bridges, Add Third Track to Busiest LIRR Corridor The Metropolitan Transportation Authority (MTA) Board on Wednesday approved a design-build contract with 3rd Track Constructors (3TC), to complete the design and construction of the crucial Long Island Rail Road...
Read More

Governor Cuomo Announces Historic $5.6 Billion Transformation of the Long Island Rail Road

By | Accabonac Road Bridge and North Main Street Bridge, Baldwin Station, Bayside Station, Bellmore Station, Bellmore Substation, Brentwood Station, Buckram Road Bridge, Carle Place Station, Carle Place Substation, Cherry Lane Bridge, Cherry Valley Road Bridge, Covert Avenue Grade Crossing, Deer Park Station, Double Track, East Hampton Station, East Side Access, East Yaphank Station, Farmingdale Station, Floral Park Parking Re-Surfacing, Floral Park Station, Floral Park Substation, Flushing Main Street Bridge, Flushing Main Street Station, Glen Cove Bridge, Great Neck Station, Hicksville Parking, Hicksville Station, Hicksville Substation, Jamaica Capacity Improvements, LIRR Expansion Project, Lynbrook Viaduct, Main Street Grade Crossing, Meadowbrook Parkway Bridge, Meadowbrook Substation, Merillon Avenue Station, Merillon Avenue Substation, Merrick Station, Mets-Willets Point Station, Mid-Suffolk Train Storage Yard, Mineola Harrison Avenue Parking Structure, Mineola Main Street Parking, Mineola Second Street Parking, Mineola Station, Mineola Substation, Morris Park Diesel Locomotive Shop, Moynihan Train Hall, Murray Hill Station, Murray Hill Substation, Nassau Boulevard Bridge, New 33rd Street Corridor at Penn Station, New Cassel Substation, New Hyde Park Road Grade Crossing, New Hyde Park Road Surface Lot, New Hyde Park Station, New Hyde Park Substation, New M9 Rail Cars, Northport Station, Nostrand Avenue Station, Ocean Avenue Substation, Plainfield Avenue Bridge, Port Jefferson Station, Port Washington Substation, Positive Train Control, Post Avenue Bridge, Rockville Centre Viaduct, Ronkonkoma Station, Rosedale Substation, Sandy Substation Restoration, School Street Grade Crossing, South 12th Street Grade Crossing, South Tyson Avenue Bridge, Springfield Boulevard Bridge, Stewart Manor Station, Stony Brook Station, Syosset Station, Tanners Pond/Denton Avenue Bridge, Urban Avenue Grade Crossing, Valley Stream Station, Wantagh Station, Webster Avenue Bridge, Westbury North Parking Structure, Westbury South Parking Structure and LIRR Lot Development, Westbury Station, Westbury Substation, Willis Avenue Grade Crossing, Wreck Lead Bridge, Wyandanch Station

Governor Andrew M. Cuomo today announced a historic $5.6 billion transformation of the Long Island Rail Road to strengthen the region’s transportation infrastructure and usher in a new era of economic growth. After 70 years of stagnation, all 100 transformative LIRR capital projects are moving forward, including the Main Line…

Read More