Accabonac Road - 11-18-19

Accabonac Road / North Main Street Bridge Replacements (Completed 11/2019)

Accabonac Road and North Main Street bridges have been replaced to reduce truck strikes and improve infrastructure.

Baldwin Station 11-08-18

Baldwin Station Enhancement (Completed 06/2019)

Baldwin Station has received modernized station enhancements and upgrades.

Bayside Station

Bayside Station Enhancement (Completed 03/2019)

Bayside Station has received modernized station enhancements and upgrades.

Bellmore Station Enhancement (Completed 06/2019)

Bellmore Station Enhancement (Completed 06/2019)

Bellmore Station has received modernized station enhancements and upgrades.

Bellmore Substation 2-13-18

Bellmore Substation Replacement

The Bellmore substation will be replaced to provide more reliable power to LIRR trains.

Brentwood Station 11-08-18

Brentwood Station Enhancement (Completed 06/2019)

Brentwood Station has received modernized station enhancements and upgrades.

Buckram Road Bridge Replacement 02-20-20

Buckram Road Bridge Replacement (Completed 10/2019)

Buckram Road Bridge has been replaced to reduce truck strikes and improve infrastructure.

Carle Place Station Enhancement (rendering)

Carle Place Station Enhancement

Carle Place Station is receiving modernized station enhancements and upgrades.

Carle Place Substation

Carle Place Substation Replacement

The Carle Place substation will be replaced to accommodate the additional third track on the Main Line.

Cherry Lane Bridge 06-03-19

Cherry Lane Bridge Replacement (Completed 06/2019)

Cherry Lane Bridge has been replaced to reduce truck strikes and improve infrastructure.

Cherry Valley Road Bridge Prior to Construction

Cherry Valley Road Bridge Replacement

Cherry Valley Road Bridge will be replaced to reduce truck strikes and improve infrastructure.

Covert Avenue Grade Crossing Elimination Offical Opening of Underpass - 10-17-19

Covert Avenue Grade Crossing Elimination (Completed 10/2019)

Covert Avenue Grade Crossing Elimination – Completed October 2019

Deer Park Dahlias (2018) © William Low, LIRR Deer Park Station

Deer Park Station Enhancement (Completed 04/2019)

Deer Park has received modernized station enhancements and upgrades.

East End Gateway and LIRR Concourse

The 33rd Street Corridor will be widened and redesigned and accessible from a new entrance pavilion.

East Hampton Station Enhancement (Completed 04/2019)

East Hampton has received modernized station enhancements and upgrades

East Side Access Removed 08-03-2018

East Side Access

A transformative project connecting LIRR to Grand Central Terminal.

Elmont Station

The new Elmont LIRR Station, the first new full-time LIRR station in nearly 50 years, is part of the $1.26 billion Belmont Park Redevelopment Project.

Farmingdale Station 11-08-18

Farmingdale Station Enhancement (Completed 04/2019)

Farmingdale Station has received modernized station enhancements and upgrades.

Floral Park Parking Re-Surfacing at Creedmoor Spur

This popular Village parking area will be repaved and restriped.

Floral Park Station - 03-07-19

Floral Park Station Enhancement

Floral Park Station is receiving modernized station enhancements and upgrades.

Floral Park Substation Modifications

The Floral Park substation will be modified to accommodate the additional third track on the Main Line.

Flushing Main Street Bridge

Flushing Main Street Bridge Rehabilitation (Completed 11/2019)

Flushing Main Street Bridge has been rehabilitated.

Flushing Main Street Station 8-31-2018

Flushing Main Street Station Enhancement (Completed 08/2018)

Flushing Main Street Station has received modernized station enhancements and upgrades.

Glen Cove Rd Bridge 09-22-20

Glen Cove Road Bridge Replacement (Completed 06/2020)

Glen Cove Road Bridge is being replaced to improve infrastructure and accommodate a new third track on the mainline.

Great Neck Station Enhancement (Completed 04/2019)

Great Neck Station has received modernized station enhancements and upgrades.

Hempstead Station - 03-12-19

Hempstead Station Enhancement (Completed 07/2019)

Hempstead Station has received modernized station enhancements and upgrades.

Hicksville Parking/Downtown Revitalization Initiative

The MTA is working with the Town to fulfill their vision of a walkable community that enlivens the train station area.

Hicksville Station Improvements Project (Completed 08/2018)

Hicksville Station Improvements Project (Completed 08/2018)

Hicksville Station has been completely renovated with modernized station enhancements and upgrades.

Hicksville Substation Replacement

The Hicksville substation will be replaced to accommodate the additional third track on the Main Line.

Project Rendering

Jamaica Capacity Improvements

A comprehensive reconfiguration of Jamaica Station is currently underway to improve capacity and reliability.

Laurelton Station - 03-12-19

Laurelton Station Enhancement (Completed 12/2019)

Laurelton Station has been improved and modernized.

Linden Avenue Pedestrian Underpass 04-29-20

Linden Avenue Pedestrian Underpass (Completed 04/2020)

The pedestrian underpass at Linden Avenue in Floral Park is being replaced to accommodate the new third track on the Main Line.

LIRR Double Track Project Farmingdale to Ronkonkoma (Completed 09/2018)

The Double Track Project introduces 13 miles of a new second track between Farmingdale and Ronkonkoma.

LIRR Expansion Project Floral Park to Hicksville

LIRR Expansion Project Floral Park to Hicksville

The LIRR Expansion Project will introduce 9.8 miles of a new third track, close dangerous grade crossings and upgrade stations along this heavily traversed corridor.

LIRR Mid-Suffolk Train Storage Yard

An expanded train storage yard and a new employee facility are being built to meet the anticipated increase in AM and PM peak ridership once East Side Access opens in 2022.

Locust Manor Station Enhancement - 03-12-19

Locust Manor Station Enhancement (Completed 05/2019)

Locust Manor Station has been modernized and upgraded.

Lynbrook Station Enhancement (rendering)

Lynbrook Station Enhancement (Completed 10/8/2020)

The Lynbrook Station infrastructure is being renewed and its amenities are being upgraded.

Lynbrook Viaduct - 10-24-19

Lynbrook Viaduct Rehabilitation

The Lynbrook Viaduct is being rehabilitated and repaired, including improvements to the existing drainage system.

Main Street Grade Crossing Elimination

The elimination of the Main Street grade crossing will alleviate train and vehicular traffic and enhance safety.

Meadowbrook Parkway Bridge Modification

Meadowbrook Parkway Bridge is being modified to improve infrastructure and to accommodate a third track on the Main Line.

Meadowbrook Substation Replacement 10-12-18

Meadowbrook Substation Replacement (Completed 06/2020)

The Meadowbrook substation will be replaced to provide more reliable power to LIRR trains.

Merillon Avenue Station Enhancement

Merillon Station will receive modernized station enhancements and upgrades.

Merillon Avenue Substation Replacement

The Mineola substation, located at the southwest corner of Main Street and Front Street in Mineola, will be replaced as part of the LIRR Expansion Project.

Merrick Station Enhancement

Merrick Station Enhancement (Completed 01/2019)

Merrick Station has received modernized station enhancements and upgrades.

Mets-Willets Point Station Pre-Construction

Mets-Willets Point Station

The seasonal Mets-Willets Point Station will receive modernized station enhancements and upgrades.

Mineola 2nd Street Parking

New parking is planned at the Mineola Station Second Street Parking Lot.

Mineola Harrison Avenue Parking Structure 10-25-19

Mineola Harrison Avenue Parking Structure

A new parking garage is being constructed at Mineola Station west of Mineola Boulevard between Harrison Avenue and First Street.

Mineola Main Street Parking and Drop-Off

New surface parking and a kiss-and-ride will be constructed at Mineola Station.

Mineola Station Enhancement

Mineola Station will receive modernized station enhancements and upgrades.

Mineola Substation Prior to Construction

Mineola Substation Replacement

The Mineola substation, located at the southwest corner of Main Street and Front Street in Mineola, will be replaced as part of the LIRR Expansion Project from Floral Park to Hicksville.

Morris Park Diesel Locomotive Shop

Morris Park Diesel Locomotive Shop is receiving upgrades to maximize efficiency.

Moynihan Train Hall

The new Moynihan Train Hall will alleviate overcrowding at Penn Station and improve the customer experience for LIRR passengers.

Murray Hill Station prior to enhancements

Murray Hill Station – New Elevators (Completed 04/2020)

Murray Hill Station is receiving modernized station enhancements and upgrades.

Murray Hill Substation – 01-29-19

Murray Hill Substation Replacement

The Murray Hill substation will be replaced to provide more reliable power to LIRR trains.

Nassau Bridge 02-14-20

Nassau Boulevard Bridge Replacement (Completed 10/2019)

Nassau Boulevard Bridge Replacement – Completed October 2019

New Cassel Substation Replacement

The New Cassel substation will be replaced to accommodate the additional third track on the Main Line.

New Hyde Park Road Grade Crossing Elimination (Completed 08/2020)

The New Hyde Park Road grade crossing is being eliminated to alleviate train and vehicular traffic and improve safety.

New Hyde Park Road Surface Lot

A new surface lot and a kiss-and-ride will be constructed at New Hyde Park Station between Plaza Avenue and Second Avenue.

New Hyde Park Station Enhancement

New Hyde Park Station will receive modernized station enhancements and upgrades.

New Hyde Park Substation Replacement

New Hyde Park Substation Replacement

The New Hyde Park substation will be replaced to accommodate the additional third track on the Main Line.

New M9 Rail Cars

New M9 Rail Cars

The next generation of commuter rail cars is coming to the Long Island Rail Road to increase service reliability and improve the customer experience.

East Yaphank Sign

New Yaphank Station

Design and identification of new station site locations is underway.

Northport Masthead 11-08-18

Northport Station Enhancement (Completed 01/2019)

Northport Station has received modernized station enhancements and upgrades.

Nostrand Ave Station Rehabilitation (Completed 01/2020)

Nostrand Avenue Station has received modernized station enhancements and upgrades.

Ocean Avenue Substation Prior to Construction

Ocean Avenue Substation Replacement

The Ocean Avenue substation will be replaced to provide more reliable power to LIRR trains.

Pinelawn Station Enhancement (Completed 09/2018)

Pinelawn Station Enhancement (Completed 09/2018)

Pinelawn Station has been modernized and improved.

Winter 2018 – Plainfield Ave Bridge Prior to Construction

Plainfield Avenue Bridge Modification (Completed 04/2020)

Plainfield Avenue Bridge is being modified to reduce truck strikes and improve infrastructure.

Plaza and Entrance - Port Jefferson Station - 01-29-19

Port Jefferson Station Enhancement (Completed 03/2019)

Port Jefferson Station has received modernized station enhancements and upgrades.

Port Washington Substation Replacement (Completed 01/2019)

Port Washington Substation Replacement (Completed 01/2019)

The Port Washington Substation has been replaced.

Positive Train Control

Positive Train Control is being integrated into LIRR infrastructure to enhance railroad safety.

Post Avenue Bridge Replacement (Completed 10/2017)

The successful Post Avenue Bridge replacement serves as a construction model for bridge improvements throughout Long Island.

Rockville Centre Viaduct Rehabilitation

Rockville Centre Viaduct Rehabilitation

The Rockville Centre Viaduct is being rehabilitated and repaired, including improvements to the existing drainage system.

Ronkonkoma Station 12-12-2018

Ronkonkoma Station Enhancement (Completed 3/2019)

Ronkonkoma Station has been modernized and improved.

Rosedale Substation Replacement

Rosedale Substation Replacement

Rosedale substation will be replaced to provide more reliable power to LIRR trains.

Sandy Substation Restoration / Long Beach Branch (Completed 01/2018)

Replacement of three substations along the Long Beach Branch has been successfully completed.

School Street Grade Crossing Elimination 11-13-20

School Street Grade Crossing Elimination (Completed 11/2020)

The School Street grade crossing is being eliminated to alleviate train and vehicular traffic and to increase safety.

South 12th Street Grade Crossing Prior to Construction

South 12th Street Grade Crossing Elimination

Vehicular traffic crossing the LIRR tracks at the South 12th Street grade crossing will be permanently closed and redirected.

South Tyson Avenue Bridge Modification (Completed 09/2019)

The South Tyson Avenue Bridge has been replaced to accommodate a new third track.

Springfield Boulevard Bridge 09-25-19

Springfield Boulevard Bridge Rehabilitation (Completed 8/2019)

The rehabilitated Springfield Boulevard Bridge will keep LIRR in a state-of-good-repair.

Stewart Manor Station Enhancement (Completed 01/2019)

Stewart Manor Station Enhancement (Completed 01/2019)

Stewart Manor Station has been modernized and improved.

Stony Brook 11-20-2018

Stony Brook Station Enhancement (Completed 04/2019)

Stony Brook Station has received modernized station enhancements and upgrades.

Syosset Station Enhancement (Completed 06/2019)

Syosset Station Enhancement (Completed 06/2019)

Syosset Station has received modernized station enhancements and upgrades.

Tanners Pond / Denton Avenue Bridge Replacement Pre-Construction

Tanners Pond / Denton Avenue Bridge Replacement

Tanners Pond Road / Denton Avenue Bridge will be replaced to reduce truck strikes and improve infrastructure.

Urban Avenue Grade Crossing Elimination 11-13-19

Urban Avenue Grade Crossing Elimination (Completed 09/2019)

Urban Avenue Grade Crossing Elimination – Completed September 2019

Valley Stream Station Enhancement (Completed 02/2019)

Valley Stream Station Enhancement (Completed 02/2019)

Valley Stream Station has received modernized station enhancements and upgrades.

Wantagh Station Platform Replacement (Completed 10/2018)

Wantagh Station Platform Replacement (Completed 10/2018)

The $27 Million renovation project at Wantagh Station is finished.

Webster Avenue Bridge Pre-Construction Phase

Webster Avenue Bridge Rehabilitation

The rehabilitation of the aging Webster Avenue Bridge will enhance safety and reduce maintenance on the Port Washington Branch.

Westbury North Parking Structure

A new parking garage is being constructed north of Westbury Station.

Westbury South Parking and LIRR Lot Development

The MTA is working with the Village to accommodate new parking and redevelopment south of Westbury Station.

Westbury Station Enhancement (rendering)

Westbury Station Enhancement

Westbury Station will receive modernized station enhancements and upgrades.

Westbury Substation Replacement

Westbury Substation Replacement

The Westbury substation will be replaced to accommodate the additional third track on the Main Line.

Willis Avenue Grade Crossing Elimination

The Willis Avenue grade crossing is being eliminated to alleviate train and vehicular congestion and improve safety.

Wreck Lead Bridge 10-31-18

Wreck Lead Bridge Rehabilitation

The rehabilitation of the aging Wreck Lead Bridge will improve the operational reliability of the bridge.

Wyandanch Station Enhancement (Completed 09/2018)

Wyandanch Station has received modernized station enhancements and upgrades.

East End Gateway and LIRR Concourse

The 33rd Street Corridor will be widened and redesigned and accessible from a new entrance pavilion.

East Side Access Removed 08-03-2018

East Side Access

A transformative project connecting LIRR to Grand Central Terminal.

Project Rendering

Jamaica Capacity Improvements

A comprehensive reconfiguration of Jamaica Station is currently underway to improve capacity and reliability.

LIRR Double Track Project Farmingdale to Ronkonkoma (Completed 09/2018)

The Double Track Project introduces 13 miles of a new second track between Farmingdale and Ronkonkoma.

LIRR Expansion Project Floral Park to Hicksville

LIRR Expansion Project Floral Park to Hicksville

The LIRR Expansion Project will introduce 9.8 miles of a new third track, close dangerous grade crossings and upgrade stations along this heavily traversed corridor.

LIRR Mid-Suffolk Train Storage Yard

An expanded train storage yard and a new employee facility are being built to meet the anticipated increase in AM and PM peak ridership once East Side Access opens in 2022.

Moynihan Train Hall

The new Moynihan Train Hall will alleviate overcrowding at Penn Station and improve the customer experience for LIRR passengers.

New M9 Rail Cars

New M9 Rail Cars

The next generation of commuter rail cars is coming to the Long Island Rail Road to increase service reliability and improve the customer experience.

Accabonac Road - 11-18-19

Accabonac Road / North Main Street Bridge Replacements (Completed 11/2019)

Accabonac Road and North Main Street bridges have been replaced to reduce truck strikes and improve infrastructure.

Buckram Road Bridge Replacement 02-20-20

Buckram Road Bridge Replacement (Completed 10/2019)

Buckram Road Bridge has been replaced to reduce truck strikes and improve infrastructure.

Cherry Lane Bridge 06-03-19

Cherry Lane Bridge Replacement (Completed 06/2019)

Cherry Lane Bridge has been replaced to reduce truck strikes and improve infrastructure.

Cherry Valley Road Bridge Prior to Construction

Cherry Valley Road Bridge Replacement

Cherry Valley Road Bridge will be replaced to reduce truck strikes and improve infrastructure.

Flushing Main Street Bridge

Flushing Main Street Bridge Rehabilitation (Completed 11/2019)

Flushing Main Street Bridge has been rehabilitated.

Glen Cove Rd Bridge 09-22-20

Glen Cove Road Bridge Replacement (Completed 06/2020)

Glen Cove Road Bridge is being replaced to improve infrastructure and accommodate a new third track on the mainline.

Lynbrook Viaduct - 10-24-19

Lynbrook Viaduct Rehabilitation

The Lynbrook Viaduct is being rehabilitated and repaired, including improvements to the existing drainage system.

Meadowbrook Parkway Bridge Modification

Meadowbrook Parkway Bridge is being modified to improve infrastructure and to accommodate a third track on the Main Line.

Nassau Bridge 02-14-20

Nassau Boulevard Bridge Replacement (Completed 10/2019)

Nassau Boulevard Bridge Replacement – Completed October 2019

Winter 2018 – Plainfield Ave Bridge Prior to Construction

Plainfield Avenue Bridge Modification (Completed 04/2020)

Plainfield Avenue Bridge is being modified to reduce truck strikes and improve infrastructure.

Post Avenue Bridge Replacement (Completed 10/2017)

The successful Post Avenue Bridge replacement serves as a construction model for bridge improvements throughout Long Island.

Rockville Centre Viaduct Rehabilitation

Rockville Centre Viaduct Rehabilitation

The Rockville Centre Viaduct is being rehabilitated and repaired, including improvements to the existing drainage system.

South Tyson Avenue Bridge Modification (Completed 09/2019)

The South Tyson Avenue Bridge has been replaced to accommodate a new third track.

Springfield Boulevard Bridge 09-25-19

Springfield Boulevard Bridge Rehabilitation (Completed 8/2019)

The rehabilitated Springfield Boulevard Bridge will keep LIRR in a state-of-good-repair.

Tanners Pond / Denton Avenue Bridge Replacement Pre-Construction

Tanners Pond / Denton Avenue Bridge Replacement

Tanners Pond Road / Denton Avenue Bridge will be replaced to reduce truck strikes and improve infrastructure.

Webster Avenue Bridge Pre-Construction Phase

Webster Avenue Bridge Rehabilitation

The rehabilitation of the aging Webster Avenue Bridge will enhance safety and reduce maintenance on the Port Washington Branch.

Wreck Lead Bridge 10-31-18

Wreck Lead Bridge Rehabilitation

The rehabilitation of the aging Wreck Lead Bridge will improve the operational reliability of the bridge.

Floral Park Parking Re-Surfacing at Creedmoor Spur

This popular Village parking area will be repaved and restriped.

Hicksville Parking/Downtown Revitalization Initiative

The MTA is working with the Town to fulfill their vision of a walkable community that enlivens the train station area.

Mineola 2nd Street Parking

New parking is planned at the Mineola Station Second Street Parking Lot.

Mineola Harrison Avenue Parking Structure 10-25-19

Mineola Harrison Avenue Parking Structure

A new parking garage is being constructed at Mineola Station west of Mineola Boulevard between Harrison Avenue and First Street.

Mineola Main Street Parking and Drop-Off

New surface parking and a kiss-and-ride will be constructed at Mineola Station.

New Hyde Park Road Surface Lot

A new surface lot and a kiss-and-ride will be constructed at New Hyde Park Station between Plaza Avenue and Second Avenue.

Westbury North Parking Structure

A new parking garage is being constructed north of Westbury Station.

Westbury South Parking and LIRR Lot Development

The MTA is working with the Village to accommodate new parking and redevelopment south of Westbury Station.

Covert Avenue Grade Crossing Elimination Offical Opening of Underpass - 10-17-19

Covert Avenue Grade Crossing Elimination (Completed 10/2019)

Covert Avenue Grade Crossing Elimination – Completed October 2019

Main Street Grade Crossing Elimination

The elimination of the Main Street grade crossing will alleviate train and vehicular traffic and enhance safety.

New Hyde Park Road Grade Crossing Elimination (Completed 08/2020)

The New Hyde Park Road grade crossing is being eliminated to alleviate train and vehicular traffic and improve safety.

School Street Grade Crossing Elimination 11-13-20

School Street Grade Crossing Elimination (Completed 11/2020)

The School Street grade crossing is being eliminated to alleviate train and vehicular traffic and to increase safety.

South 12th Street Grade Crossing Prior to Construction

South 12th Street Grade Crossing Elimination

Vehicular traffic crossing the LIRR tracks at the South 12th Street grade crossing will be permanently closed and redirected.

Urban Avenue Grade Crossing Elimination 11-13-19

Urban Avenue Grade Crossing Elimination (Completed 09/2019)

Urban Avenue Grade Crossing Elimination – Completed September 2019

Willis Avenue Grade Crossing Elimination

The Willis Avenue grade crossing is being eliminated to alleviate train and vehicular congestion and improve safety.

Baldwin Station 11-08-18

Baldwin Station Enhancement (Completed 06/2019)

Baldwin Station has received modernized station enhancements and upgrades.

Bayside Station

Bayside Station Enhancement (Completed 03/2019)

Bayside Station has received modernized station enhancements and upgrades.

Bellmore Station Enhancement (Completed 06/2019)

Bellmore Station Enhancement (Completed 06/2019)

Bellmore Station has received modernized station enhancements and upgrades.

Brentwood Station 11-08-18

Brentwood Station Enhancement (Completed 06/2019)

Brentwood Station has received modernized station enhancements and upgrades.

Carle Place Station Enhancement (rendering)

Carle Place Station Enhancement

Carle Place Station is receiving modernized station enhancements and upgrades.

Deer Park Dahlias (2018) © William Low, LIRR Deer Park Station

Deer Park Station Enhancement (Completed 04/2019)

Deer Park has received modernized station enhancements and upgrades.

East Hampton Station Enhancement (Completed 04/2019)

East Hampton has received modernized station enhancements and upgrades

Elmont Station

The new Elmont LIRR Station, the first new full-time LIRR station in nearly 50 years, is part of the $1.26 billion Belmont Park Redevelopment Project.

Farmingdale Station 11-08-18

Farmingdale Station Enhancement (Completed 04/2019)

Farmingdale Station has received modernized station enhancements and upgrades.

Floral Park Station - 03-07-19

Floral Park Station Enhancement

Floral Park Station is receiving modernized station enhancements and upgrades.

Flushing Main Street Station 8-31-2018

Flushing Main Street Station Enhancement (Completed 08/2018)

Flushing Main Street Station has received modernized station enhancements and upgrades.

Great Neck Station Enhancement (Completed 04/2019)

Great Neck Station has received modernized station enhancements and upgrades.

Hempstead Station - 03-12-19

Hempstead Station Enhancement (Completed 07/2019)

Hempstead Station has received modernized station enhancements and upgrades.

Hicksville Station Improvements Project (Completed 08/2018)

Hicksville Station Improvements Project (Completed 08/2018)

Hicksville Station has been completely renovated with modernized station enhancements and upgrades.

Laurelton Station - 03-12-19

Laurelton Station Enhancement (Completed 12/2019)

Laurelton Station has been improved and modernized.

Locust Manor Station Enhancement - 03-12-19

Locust Manor Station Enhancement (Completed 05/2019)

Locust Manor Station has been modernized and upgraded.

Lynbrook Station Enhancement (rendering)

Lynbrook Station Enhancement (Completed 10/8/2020)

The Lynbrook Station infrastructure is being renewed and its amenities are being upgraded.

Merillon Avenue Station Enhancement

Merillon Station will receive modernized station enhancements and upgrades.

Merrick Station Enhancement

Merrick Station Enhancement (Completed 01/2019)

Merrick Station has received modernized station enhancements and upgrades.

Mets-Willets Point Station Pre-Construction

Mets-Willets Point Station

The seasonal Mets-Willets Point Station will receive modernized station enhancements and upgrades.

Mineola Station Enhancement

Mineola Station will receive modernized station enhancements and upgrades.

Murray Hill Station prior to enhancements

Murray Hill Station – New Elevators (Completed 04/2020)

Murray Hill Station is receiving modernized station enhancements and upgrades.

New Hyde Park Station Enhancement

New Hyde Park Station will receive modernized station enhancements and upgrades.

East Yaphank Sign

New Yaphank Station

Design and identification of new station site locations is underway.

Northport Masthead 11-08-18

Northport Station Enhancement (Completed 01/2019)

Northport Station has received modernized station enhancements and upgrades.

Nostrand Ave Station Rehabilitation (Completed 01/2020)

Nostrand Avenue Station has received modernized station enhancements and upgrades.

Pinelawn Station Enhancement (Completed 09/2018)

Pinelawn Station Enhancement (Completed 09/2018)

Pinelawn Station has been modernized and improved.

Plaza and Entrance - Port Jefferson Station - 01-29-19

Port Jefferson Station Enhancement (Completed 03/2019)

Port Jefferson Station has received modernized station enhancements and upgrades.

Ronkonkoma Station 12-12-2018

Ronkonkoma Station Enhancement (Completed 3/2019)

Ronkonkoma Station has been modernized and improved.

Stewart Manor Station Enhancement (Completed 01/2019)

Stewart Manor Station Enhancement (Completed 01/2019)

Stewart Manor Station has been modernized and improved.

Stony Brook 11-20-2018

Stony Brook Station Enhancement (Completed 04/2019)

Stony Brook Station has received modernized station enhancements and upgrades.

Syosset Station Enhancement (Completed 06/2019)

Syosset Station Enhancement (Completed 06/2019)

Syosset Station has received modernized station enhancements and upgrades.

Valley Stream Station Enhancement (Completed 02/2019)

Valley Stream Station Enhancement (Completed 02/2019)

Valley Stream Station has received modernized station enhancements and upgrades.

Wantagh Station Platform Replacement (Completed 10/2018)

Wantagh Station Platform Replacement (Completed 10/2018)

The $27 Million renovation project at Wantagh Station is finished.

Westbury Station Enhancement (rendering)

Westbury Station Enhancement

Westbury Station will receive modernized station enhancements and upgrades.

Wyandanch Station Enhancement (Completed 09/2018)

Wyandanch Station has received modernized station enhancements and upgrades.

Bellmore Substation 2-13-18

Bellmore Substation Replacement

The Bellmore substation will be replaced to provide more reliable power to LIRR trains.

Carle Place Substation

Carle Place Substation Replacement

The Carle Place substation will be replaced to accommodate the additional third track on the Main Line.

Floral Park Substation Modifications

The Floral Park substation will be modified to accommodate the additional third track on the Main Line.

Hicksville Substation Replacement

The Hicksville substation will be replaced to accommodate the additional third track on the Main Line.

Linden Avenue Pedestrian Underpass 04-29-20

Linden Avenue Pedestrian Underpass (Completed 04/2020)

The pedestrian underpass at Linden Avenue in Floral Park is being replaced to accommodate the new third track on the Main Line.

Meadowbrook Substation Replacement 10-12-18

Meadowbrook Substation Replacement (Completed 06/2020)

The Meadowbrook substation will be replaced to provide more reliable power to LIRR trains.

Merillon Avenue Substation Replacement

The Mineola substation, located at the southwest corner of Main Street and Front Street in Mineola, will be replaced as part of the LIRR Expansion Project.

Mineola Substation Prior to Construction

Mineola Substation Replacement

The Mineola substation, located at the southwest corner of Main Street and Front Street in Mineola, will be replaced as part of the LIRR Expansion Project from Floral Park to Hicksville.

Morris Park Diesel Locomotive Shop

Morris Park Diesel Locomotive Shop is receiving upgrades to maximize efficiency.

Murray Hill Substation – 01-29-19

Murray Hill Substation Replacement

The Murray Hill substation will be replaced to provide more reliable power to LIRR trains.

New Cassel Substation Replacement

The New Cassel substation will be replaced to accommodate the additional third track on the Main Line.

New Hyde Park Substation Replacement

New Hyde Park Substation Replacement

The New Hyde Park substation will be replaced to accommodate the additional third track on the Main Line.

Ocean Avenue Substation Prior to Construction

Ocean Avenue Substation Replacement

The Ocean Avenue substation will be replaced to provide more reliable power to LIRR trains.

Port Washington Substation Replacement (Completed 01/2019)

Port Washington Substation Replacement (Completed 01/2019)

The Port Washington Substation has been replaced.

Positive Train Control

Positive Train Control is being integrated into LIRR infrastructure to enhance railroad safety.

Rosedale Substation Replacement

Rosedale Substation Replacement

Rosedale substation will be replaced to provide more reliable power to LIRR trains.

Sandy Substation Restoration / Long Beach Branch (Completed 01/2018)

Replacement of three substations along the Long Beach Branch has been successfully completed.

Westbury Substation Replacement

Westbury Substation Replacement

The Westbury substation will be replaced to accommodate the additional third track on the Main Line.

Accabonac Road / North Main Street Bridge Replacements (Completed 11/2019)

Accabonac Road and North Main Street bridges have been replaced to reduce truck strikes and improve infrastructure.

Baldwin Station Enhancement (Completed 06/2019)

Baldwin Station has received modernized station enhancements and upgrades.

Bayside Station Enhancement (Completed 03/2019)

Bayside Station has received modernized station enhancements and upgrades.

Bellmore Station Enhancement (Completed 06/2019)

Bellmore Station has received modernized station enhancements and upgrades.

Brentwood Station Enhancement (Completed 06/2019)

Brentwood Station has received modernized station enhancements and upgrades.

Buckram Road Bridge Replacement (Completed 10/2019)

Buckram Road Bridge has been replaced to reduce truck strikes and improve infrastructure.

Cherry Lane Bridge Replacement (Completed 06/2019)

Cherry Lane Bridge has been replaced to reduce truck strikes and improve infrastructure.

Covert Avenue Grade Crossing Elimination (Completed 10/2019)

Covert Avenue Grade Crossing Elimination – Completed October 2019

Deer Park Station Enhancement (Completed 04/2019)

Deer Park has received modernized station enhancements and upgrades.

East Hampton Station Enhancement (Completed 04/2019)

East Hampton has received modernized station enhancements and upgrades

Farmingdale Station Enhancement (Completed 04/2019)

Farmingdale Station has received modernized station enhancements and upgrades.

Flushing Main Street Bridge Rehabilitation (Completed 11/2019)

Flushing Main Street Bridge has been rehabilitated.

Glen Cove Road Bridge Replacement (Completed 06/2020)

Glen Cove Road Bridge is being replaced to improve infrastructure and accommodate a new third track on the mainline.

Great Neck Station Enhancement (Completed 04/2019)

Great Neck Station has received modernized station enhancements and upgrades.

Hempstead Station Enhancement (Completed 07/2019)

Hempstead Station has received modernized station enhancements and upgrades.

Hicksville Station Improvements Project (Completed 08/2018)

Hicksville Station has been completely renovated with modernized station enhancements and upgrades.

Laurelton Station Enhancement (Completed 12/2019)

Laurelton Station has been improved and modernized.

Linden Avenue Pedestrian Underpass (Completed 04/2020)

The pedestrian underpass at Linden Avenue in Floral Park is being replaced to accommodate the new third track on the Main Line.

LIRR Double Track Project Farmingdale to Ronkonkoma (Completed 09/2018)

The Double Track Project introduces 13 miles of a new second track between Farmingdale and Ronkonkoma.

Locust Manor Station Enhancement (Completed 05/2019)

Locust Manor Station has been modernized and upgraded.

Lynbrook Station Enhancement (Completed 10/8/2020)

The Lynbrook Station infrastructure is being renewed and its amenities are being upgraded.

Meadowbrook Substation Replacement (Completed 06/2020)

The Meadowbrook substation will be replaced to provide more reliable power to LIRR trains.

Merrick Station Enhancement (Completed 01/2019)

Merrick Station has received modernized station enhancements and upgrades.

Murray Hill Station – New Elevators (Completed 04/2020)

Murray Hill Station is receiving modernized station enhancements and upgrades.

Nassau Boulevard Bridge Replacement (Completed 10/2019)

Nassau Boulevard Bridge Replacement – Completed October 2019

New Hyde Park Road Grade Crossing Elimination (Completed 08/2020)

The New Hyde Park Road grade crossing is being eliminated to alleviate train and vehicular traffic and improve safety.

Northport Station Enhancement (Completed 01/2019)

Northport Station has received modernized station enhancements and upgrades.

Nostrand Ave Station Rehabilitation (Completed 01/2020)

Nostrand Avenue Station has received modernized station enhancements and upgrades.

Plainfield Avenue Bridge Modification (Completed 04/2020)

Plainfield Avenue Bridge is being modified to reduce truck strikes and improve infrastructure.

Port Jefferson Station Enhancement (Completed 03/2019)

Port Jefferson Station has received modernized station enhancements and upgrades.

Port Washington Substation Replacement (Completed 01/2019)

The Port Washington Substation has been replaced.

Ronkonkoma Station Enhancement (Completed 3/2019)

Ronkonkoma Station has been modernized and improved.

Sandy Substation Restoration / Long Beach Branch (Completed 01/2018)

Replacement of three substations along the Long Beach Branch has been successfully completed.

School Street Grade Crossing Elimination (Completed 11/2020)

The School Street grade crossing is being eliminated to alleviate train and vehicular traffic and to increase safety.

South Tyson Avenue Bridge Modification (Completed 09/2019)

The South Tyson Avenue Bridge has been replaced to accommodate a new third track.

Springfield Boulevard Bridge Rehabilitation (Completed 8/2019)

The rehabilitated Springfield Boulevard Bridge will keep LIRR in a state-of-good-repair.

Stewart Manor Station Enhancement (Completed 01/2019)

Stewart Manor Station has been modernized and improved.

Stony Brook Station Enhancement (Completed 04/2019)

Stony Brook Station has received modernized station enhancements and upgrades.

Syosset Station Enhancement (Completed 06/2019)

Syosset Station has received modernized station enhancements and upgrades.

Urban Avenue Grade Crossing Elimination (Completed 09/2019)

Urban Avenue Grade Crossing Elimination – Completed September 2019

Valley Stream Station Enhancement (Completed 02/2019)

Valley Stream Station has received modernized station enhancements and upgrades.

Wantagh Station Platform Replacement (Completed 10/2018)

The $27 Million renovation project at Wantagh Station is finished.

Wyandanch Station Enhancement (Completed 09/2018)

Wyandanch Station has received modernized station enhancements and upgrades.