The MTA is working with the Town to fulfill their vision of a walkable community that enlivens the train station area.
Hicksville Station Improvements Project
Hicksville Station is receiving a complete renovation with modernized station enhancements and upgrades.
Hicksville Substation Replacement
The Hicksville substation will be replaced to accommodate the additional third track on the Main Line.
Jamaica Capacity Improvements
A comprehensive reconfiguration of Jamaica Station is currently underway to improve capacity and reliability.
LIRR Double Track Project Farmingdale to Ronkonkoma
The Double Track Project introduces 13 miles of a new second track between Farmingdale and Ronkonkoma.
LIRR Expansion Project Floral Park to Hicksville
The LIRR Expansion Project will introduce 9.8 miles of a new third track, close dangerous grade crossings and upgrade stations along this heavily traversed corridor.
LIRR Mid-Suffolk Train Storage Yard
This yard will provide space for rail-car maintenance, inspections and servicing for the electric fleet.
Lynbrook Station Enhancement
The Lynbrook Station infrastructure will be renewed, and its amenities will be upgraded.
Lynbrook Viaduct Rehabilitation
The Lynbrook Viaduct will be rehabilitated and repaired including improvements to the existing drainage system.
Main Street Grade Crossing Elimination
Vehicular traffic crossing the LIRR tracks at the Main Street grade crossing will be permanently closed and redirected.
Meadowbrook Parkway Bridge Modification
Meadowbrook Parkway Bridge will be modified to accommodate a third track and improve infrastructure.
Meadowbrook Substation Replacement
The Meadowbrook substation will be replaced to provide more reliable power to LIRR trains.
Merillon Avenue Station Enhancement
Merillon Station will receive modernized station enhancements and upgrades.
Merillon Avenue Substation Replacement
The Mineola substation will be replaced to accommodate the additional third track on the Main Line.
Merrick Station Enhancement
Merrick Station is receiving modernized station enhancements and upgrades.
Mets-Willets Point Station
The seasonal Mets-Willets Point Station will receive modernized station enhancements and upgrades.
Mineola 2nd Street Parking
New parking is planned at the Mineola Station Second Street Parking Lot.
Mineola Harrison Avenue Parking Structure
A new parking garage will be constructed at Mineola Station west of Mineola Boulevard between Harrison Avenue and First Street.
Mineola Main Street Parking and Drop-Off
New surface parking and a kiss-and-ride will be constructed at Mineola Station.
Mineola Station Enhancement
Mineola Station will receive modernized station enhancements and upgrades.
Mineola Substation Replacement
The Mineola substation, located at the southwest corner of Main Street and Front Street in Mineola, will be replaced as part of the LIRR Expansion Project from Floral Park to Hicksville.
Morris Park Diesel Locomotive Shop
Morris Park Diesel Locomotive Shop will receive upgrades to maximize efficiency.
Moynihan Train Hall
A new train hall will alleviate overcrowding at Penn Station and improve the customer experience.
Murray Hill Station – New Elevators
Murray Hill Station will receive modernized station enhancements and upgrades.
Murray Hill Substation Replacement
The Murray Hill substation will be replaced to provide more reliable power to LIRR trains.
Nassau Boulevard Bridge Replacement
Nassau Boulevard Bridge will be replaced to reduce truck strikes and improve infrastructure.
New 33rd Street Corridor at Penn Station
The widening and redesign of this popular walkway will optimize other Penn Station improvements.
New Cassel Substation Replacement
The New Cassel substation will be replaced to accommodate the additional third track on the Main Line.
New Hyde Park Road Grade Crossing Elimination
The elimination of the New Hyde Park Road grade crossing will alleviate both train congestion and vehicular traffic as well as enhance safety.
New Hyde Park Road Surface Lot
A new surface lot and a kiss-and-ride will be constructed at New Hyde Park Station between Plaza Avenue and Second Avenue.
New Hyde Park Station Enhancement
New Hyde Park Station will receive modernized station enhancements and upgrades.
New Hyde Park Substation Replacement
The New Hyde Park substation will be replaced to accommodate the additional third track on the Main Line.
New M9 Rail Cars
Updating the LIRR car fleet will increase service reliability and improve the customer experience.
New Yaphank Station
LIRR is embarking on a proposal to replace the existing Yaphank Station.
Northport Station Enhancement
Northport Station is receiving modernized station enhancements and upgrades.
Nostrand Ave Station Rehabilitation
Nostrand Avenue Station will receive modernized station enhancements and upgrades.
Ocean Avenue Substation Replacement
The Ocean Avenue substation will be replaced to provide more reliable power to LIRR trains.
Plainfield Avenue Bridge Replacement
Plainfield Avenue Bridge will be replaced to reduce truck strikes and improve infrastructure.
Port Jefferson Station Enhancement
Construction is currently underway to modernize the Port Jefferson Station.
Port Washington Substation Replacement
Construction is underway to replace the Port Washington substation.
Positive Train Control
Positive Train Control is being integrated into LIRR infrastructure to enhance railroad safety.
Post Avenue Bridge Replacement
The successful Post Avenue Bridge replacement serves as a construction model for bridge improvements throughout Long Island.
Rockville Centre Viaduct Rehabilitation
The Rockville Centre Viaduct will be rehabilitated and repaired including improvements to the existing drainage system.
Ronkonkoma Station Enhancement
Plans are underway to modernize and improve the Ronkonkoma Station.
Rosedale Substation Replacement
Rosedale substation will be replaced to provide more reliable power to LIRR trains.
Sandy Substation Restoration / Long Beach Branch
Replacement of three substations along the Long Beach Branch has been successfully completed.
School Street Grade Crossing Elimination
The elimination of the School Street grade crossing will alleviate both train congestion and vehicular traffic as well as enhance safety.
South 12th Street Grade Crossing Elimination
Vehicular traffic crossing the LIRR tracks at the South 12th Street grade crossing will be permanently closed and redirected.
South Tyson Avenue Bridge Modification
South Tyson Avenue Bridge will be replaced to reduce truck strikes and improve infrastructure.
Springfield Boulevard Bridge Rehabilitation
The rehabilitation of the aging Springfield Boulevard Bridge will keep LIRR in a state-of-good-repair.
Stewart Manor Station Enhancement
Stewart Manor Station has been modernized and improved.
Stony Brook Station Enhancement
Stony Brook Station is receiving modernized station enhancements and upgrades.
Syosset Station Enhancement
Syosset Station will receive modernized station enhancements and upgrades.
Tanners Pond / Denton Avenue Bridge Replacement
Tanners Pond Road / Denton Avenue Bridge will be replaced to reduce truck strikes and improve infrastructure.
Urban Avenue Grade Crossing Elimination
The elimination of the Urban Avenue grade crossing will alleviate both train congestion and vehicular traffic as well as enhance safety.
Wantagh Station Platform Replacement
Wantagh Station is receiving modernized station enhancements and upgrades.
Webster Avenue Bridge Rehabilitation
The rehabilitation of the aging Webster Avenue Bridge will keep LIRR in a state-of-good-repair.
Westbury North Parking Structure
A new parking garage will be constructed north of Westbury Station.
Westbury South Parking and LIRR Lot Development
The MTA is working with the Village to accommodate new parking and redevelopment south of Westbury Station.
Westbury Station Enhancement
Westbury Station will receive modernized station enhancements and upgrades.
Westbury Substation Replacement
The Westbury substation will be replaced to accommodate the additional third track on the Main Line.
Willis Avenue Grade Crossing Elimination
The elimination of the Willis Avenue grade crossing will alleviate both train congestion and vehicular traffic as well as enhance safety.
Wreck Lead Bridge Rehabilitation
The rehabilitation of the aging Wreck Lead Bridge will keep LIRR in a state-of-good-repair.
Wyandanch Station Enhancement
Wyandanch Station has received modernized station enhancements and upgrades.
East Side Access
A transformative project connecting LIRR to Grand Central Terminal.
Jamaica Capacity Improvements
A comprehensive reconfiguration of Jamaica Station is currently underway to improve capacity and reliability.
LIRR Double Track Project Farmingdale to Ronkonkoma
The Double Track Project introduces 13 miles of a new second track between Farmingdale and Ronkonkoma.
LIRR Expansion Project Floral Park to Hicksville
The LIRR Expansion Project will introduce 9.8 miles of a new third track, close dangerous grade crossings and upgrade stations along this heavily traversed corridor.
LIRR Mid-Suffolk Train Storage Yard
This yard will provide space for rail-car maintenance, inspections and servicing for the electric fleet.
Moynihan Train Hall
A new train hall will alleviate overcrowding at Penn Station and improve the customer experience.
New 33rd Street Corridor at Penn Station
The widening and redesign of this popular walkway will optimize other Penn Station improvements.
New M9 Rail Cars
Updating the LIRR car fleet will increase service reliability and improve the customer experience.
Accabonac Road / North Main Street Bridge Replacements
Accabonac Road and North Main Street bridges will be replaced to reduce truck strikes and improve infrastructure.
Buckram Road Bridge Replacement
Buckram Road Bridge has been replaced to reduce truck strikes and improve infrastructure.
Cherry Lane Bridge Replacement
Cherry Lane Bridge will be replaced to reduce truck strikes and improve infrastructure.
Cherry Valley Road Bridge Replacement
Cherry Valley Road Bridge will be replaced to reduce truck strikes and improve infrastructure.
Flushing Main Street Bridge Rehabilitation
Flushing Main Street Bridge has experienced years of deterioration and will be rehabilitated.
Glen Cove Bridge Replacement
Glen Cove Road Bridge will be replaced to reduce truck strikes and improve infrastructure.
Lynbrook Viaduct Rehabilitation
The Lynbrook Viaduct will be rehabilitated and repaired including improvements to the existing drainage system.
Meadowbrook Parkway Bridge Modification
Meadowbrook Parkway Bridge will be modified to accommodate a third track and improve infrastructure.
Nassau Boulevard Bridge Replacement
Nassau Boulevard Bridge will be replaced to reduce truck strikes and improve infrastructure.
Plainfield Avenue Bridge Replacement
Plainfield Avenue Bridge will be replaced to reduce truck strikes and improve infrastructure.
Post Avenue Bridge Replacement
The successful Post Avenue Bridge replacement serves as a construction model for bridge improvements throughout Long Island.
Rockville Centre Viaduct Rehabilitation
The Rockville Centre Viaduct will be rehabilitated and repaired including improvements to the existing drainage system.
South Tyson Avenue Bridge Modification
South Tyson Avenue Bridge will be replaced to reduce truck strikes and improve infrastructure.
Springfield Boulevard Bridge Rehabilitation
The rehabilitation of the aging Springfield Boulevard Bridge will keep LIRR in a state-of-good-repair.
Tanners Pond / Denton Avenue Bridge Replacement
Tanners Pond Road / Denton Avenue Bridge will be replaced to reduce truck strikes and improve infrastructure.
Webster Avenue Bridge Rehabilitation
The rehabilitation of the aging Webster Avenue Bridge will keep LIRR in a state-of-good-repair.
Wreck Lead Bridge Rehabilitation
The rehabilitation of the aging Wreck Lead Bridge will keep LIRR in a state-of-good-repair.
Floral Park Parking Re-Surfacing at Creedmoor Spur
This popular Village parking area will be repaved and restriped.
The MTA is working with the Town to fulfill their vision of a walkable community that enlivens the train station area.
Mineola 2nd Street Parking
New parking is planned at the Mineola Station Second Street Parking Lot.
Mineola Harrison Avenue Parking Structure
A new parking garage will be constructed at Mineola Station west of Mineola Boulevard between Harrison Avenue and First Street.
Mineola Main Street Parking and Drop-Off
New surface parking and a kiss-and-ride will be constructed at Mineola Station.
New Hyde Park Road Surface Lot
A new surface lot and a kiss-and-ride will be constructed at New Hyde Park Station between Plaza Avenue and Second Avenue.
Westbury North Parking Structure
A new parking garage will be constructed north of Westbury Station.
Westbury South Parking and LIRR Lot Development
The MTA is working with the Village to accommodate new parking and redevelopment south of Westbury Station.
Covert Avenue Grade Crossing Elimination
The elimination of the Covert Avenue grade crossing will alleviate both train congestion and vehicular traffic as well as enhance safety.
Main Street Grade Crossing Elimination
Vehicular traffic crossing the LIRR tracks at the Main Street grade crossing will be permanently closed and redirected.
New Hyde Park Road Grade Crossing Elimination
The elimination of the New Hyde Park Road grade crossing will alleviate both train congestion and vehicular traffic as well as enhance safety.
School Street Grade Crossing Elimination
The elimination of the School Street grade crossing will alleviate both train congestion and vehicular traffic as well as enhance safety.
South 12th Street Grade Crossing Elimination
Vehicular traffic crossing the LIRR tracks at the South 12th Street grade crossing will be permanently closed and redirected.
Urban Avenue Grade Crossing Elimination
The elimination of the Urban Avenue grade crossing will alleviate both train congestion and vehicular traffic as well as enhance safety.
Willis Avenue Grade Crossing Elimination
The elimination of the Willis Avenue grade crossing will alleviate both train congestion and vehicular traffic as well as enhance safety.
Baldwin Station Enhancement
Baldwin Station will receive modernized station enhancements and upgrades.
Bayside Station Enhancement
Bayside Station will receive modernized station enhancements and upgrades.
Bellmore Station Enhancement
Bellmore Station will receive modernized station enhancements and upgrades.
Brentwood Station Enhancement
Brentwood Station will receive modernized station enhancements and upgrades.
Carle Place Station Enhancement
Carle Place Station will receive modernized station enhancements and upgrades.
Deer Park Station Enhancement
Deer Park Station is receiving modernized station enhancements and upgrades.
East Hampton Station Enhancement
East Hampton Station is receiving modernized station enhancements and upgrades.
Farmingdale Station Enhancement
Farmingdale Station is receiving modernized station enhancements and upgrades.
Floral Park Station Enhancement
Floral Park Station will receive modernized station enhancements and upgrades.
Flushing Main Street Station Enhancement
Flushing Main Street Station has received modernized station enhancements and upgrades.
Great Neck Station Enhancement
Great Neck Station will receive modernized station enhancements and upgrades.
Hicksville Station Improvements Project
Hicksville Station is receiving a complete renovation with modernized station enhancements and upgrades.
Lynbrook Station Enhancement
The Lynbrook Station infrastructure will be renewed, and its amenities will be upgraded.
Merillon Avenue Station Enhancement
Merillon Station will receive modernized station enhancements and upgrades.
Merrick Station Enhancement
Merrick Station is receiving modernized station enhancements and upgrades.
Mets-Willets Point Station
The seasonal Mets-Willets Point Station will receive modernized station enhancements and upgrades.
Mineola Station Enhancement
Mineola Station will receive modernized station enhancements and upgrades.
Murray Hill Station – New Elevators
Murray Hill Station will receive modernized station enhancements and upgrades.
New Hyde Park Station Enhancement
New Hyde Park Station will receive modernized station enhancements and upgrades.
New Yaphank Station
LIRR is embarking on a proposal to replace the existing Yaphank Station.
Northport Station Enhancement
Northport Station is receiving modernized station enhancements and upgrades.
Nostrand Ave Station Rehabilitation
Nostrand Avenue Station will receive modernized station enhancements and upgrades.
Port Jefferson Station Enhancement
Construction is currently underway to modernize the Port Jefferson Station.
Ronkonkoma Station Enhancement
Plans are underway to modernize and improve the Ronkonkoma Station.
Stewart Manor Station Enhancement
Stewart Manor Station has been modernized and improved.
Stony Brook Station Enhancement
Stony Brook Station is receiving modernized station enhancements and upgrades.
Syosset Station Enhancement
Syosset Station will receive modernized station enhancements and upgrades.
Wantagh Station Platform Replacement
Wantagh Station is receiving modernized station enhancements and upgrades.
Westbury Station Enhancement
Westbury Station will receive modernized station enhancements and upgrades.
Wyandanch Station Enhancement
Wyandanch Station has received modernized station enhancements and upgrades.
Bellmore Substation Replacement
The Bellmore substation will be replaced to provide more reliable power to LIRR trains.
Carle Place Substation Replacement
The Carle Place substation will be replaced to accommodate the additional third track on the Main Line.
Floral Park Substation Modifications
The Floral Park substation will be modified to accommodate the additional third track on the Main Line.
Hicksville Substation Replacement
The Hicksville substation will be replaced to accommodate the additional third track on the Main Line.
Meadowbrook Substation Replacement
The Meadowbrook substation will be replaced to provide more reliable power to LIRR trains.
Merillon Avenue Substation Replacement
The Mineola substation will be replaced to accommodate the additional third track on the Main Line.
Mineola Substation Replacement
The Mineola substation, located at the southwest corner of Main Street and Front Street in Mineola, will be replaced as part of the LIRR Expansion Project from Floral Park to Hicksville.
Morris Park Diesel Locomotive Shop
Morris Park Diesel Locomotive Shop will receive upgrades to maximize efficiency.
Murray Hill Substation Replacement
The Murray Hill substation will be replaced to provide more reliable power to LIRR trains.
New Cassel Substation Replacement
The New Cassel substation will be replaced to accommodate the additional third track on the Main Line.
New Hyde Park Substation Replacement
The New Hyde Park substation will be replaced to accommodate the additional third track on the Main Line.
Ocean Avenue Substation Replacement
The Ocean Avenue substation will be replaced to provide more reliable power to LIRR trains.
Port Washington Substation Replacement
Construction is underway to replace the Port Washington substation.
Positive Train Control
Positive Train Control is being integrated into LIRR infrastructure to enhance railroad safety.
Rosedale Substation Replacement
Rosedale substation will be replaced to provide more reliable power to LIRR trains.
Sandy Substation Restoration / Long Beach Branch
Replacement of three substations along the Long Beach Branch has been successfully completed.
Westbury Substation Replacement
The Westbury substation will be replaced to accommodate the additional third track on the Main Line.