Accabonac Road / North Main Street Bridge Replacements (Completed 11/2019)
Accabonac Road and North Main Street bridges have been replaced to reduce truck strikes and improve infrastructure.
Baldwin Station Enhancement (Completed 06/2019)
Baldwin Station has received modernized station enhancements and upgrades.
Bayside Station Enhancement (Completed 03/2019)
Bayside Station has received modernized station enhancements and upgrades.
Bellmore Station Enhancement (Completed 06/2019)
Bellmore Station has received modernized station enhancements and upgrades.
Brentwood Station Enhancement (Completed 06/2019)
Brentwood Station has received modernized station enhancements and upgrades.
Buckram Road Bridge Replacement (Completed 10/2019)
Buckram Road Bridge has been replaced to reduce truck strikes and improve infrastructure.
Carle Place Station Enhancement (Completed 11/2021)
Carle Place Station is receiving modernized station enhancements and upgrades.
Cherry Lane Bridge Replacement (Completed 06/2019)
Cherry Lane Bridge has been replaced to reduce truck strikes and improve infrastructure.
Covert Avenue Grade Crossing Elimination (Completed 10/2019)
Covert Avenue Grade Crossing Elimination – Completed October 2019
Deer Park Station Enhancement (Completed 04/2019)
Deer Park has received modernized station enhancements and upgrades.
East Hampton Station Enhancement (Completed 04/2019)
East Hampton has received modernized station enhancements and upgrades
Farmingdale Station Enhancement (Completed 04/2019)
Farmingdale Station has received modernized station enhancements and upgrades.
Floral Park Station Enhancement (Completed 06/2021)
Floral Park Station is receiving modernized station enhancements and upgrades.
Flushing Main Street Bridge Rehabilitation (Completed 11/2019)
Flushing Main Street Bridge has been rehabilitated.
Glen Cove Road Bridge Replacement (Completed 06/2020)
Glen Cove Road Bridge is being replaced to improve infrastructure and accommodate a new third track on the mainline.
Great Neck Station Enhancement (Completed 04/2019)
Great Neck Station has received modernized station enhancements and upgrades.
Hempstead Station Enhancement (Completed 07/2019)
Hempstead Station has received modernized station enhancements and upgrades.
Hicksville Station Improvements Project (Completed 08/2018)
Hicksville Station has been completely renovated with modernized station enhancements and upgrades.
Laurelton Station Enhancement (Completed 12/2019)
Laurelton Station has been improved and modernized.
Linden Avenue Pedestrian Underpass (Completed 04/2020)
The pedestrian underpass at Linden Avenue in Floral Park is being replaced to accommodate the new third track on the Main Line.
LIRR Double Track Project Farmingdale to Ronkonkoma (Completed 09/2018)
The Double Track Project introduces 13 miles of a new second track between Farmingdale and Ronkonkoma.
Locust Manor Station Enhancement (Completed 05/2019)
Locust Manor Station has been modernized and upgraded.
Lynbrook Station Enhancement (Completed 10/2020)
The Lynbrook Station infrastructure is being renewed and its amenities are being upgraded.
Lynbrook Viaduct Rehabilitation (Completed 05/2021)
The Lynbrook Viaduct is being rehabilitated and repaired, including improvements to the existing drainage system.
Main Street Grade Crossing Elimination (Closed 02/2021)
The elimination of the Main Street grade crossing will alleviate train and vehicular traffic and enhance safety.
Meadowbrook Parkway Bridge Modification (Completed 9/2020)
Meadowbrook Parkway Bridge is being modified to improve infrastructure and to accommodate a third track on the Main Line.
Meadowbrook Substation Replacement (Completed 06/2020)
The Meadowbrook substation will be replaced to provide more reliable power to LIRR trains.
Merrick Station Enhancement (Completed 01/2019)
Merrick Station has received modernized station enhancements and upgrades.
Mid-Suffolk Train Storage Yard (Completed 11/2020)
An expanded train storage yard and a new employee facility are being built to meet the anticipated increase in AM and PM peak ridership once East Side Access opens in 2022.
Mineola Harrison Avenue Parking Structure (Completed 12/2021)
A new parking garage is being constructed at Mineola Station west of Mineola Boulevard between Harrison Avenue and First Street.
Morris Park Diesel Locomotive Shop (Completed 11/2020)
Morris Park Diesel Locomotive Shop is receiving upgrades to maximize efficiency.
Moynihan Train Hall (Completed 12/2020)
The new Moynihan Train Hall will alleviate overcrowding at Penn Station and improve the customer experience for LIRR passengers.
Murray Hill Station – New Elevators (Completed 04/2020)
Murray Hill Station is receiving modernized station enhancements and upgrades.
Nassau Boulevard Bridge Replacement (Completed 10/2019)
Nassau Boulevard Bridge Replacement – Completed October 2019
New Hyde Park Road Grade Crossing Elimination (Completed 08/2020)
The New Hyde Park Road grade crossing is being eliminated to alleviate train and vehicular traffic and improve safety.
Northport Station Enhancement (Completed 01/2019)
Northport Station has received modernized station enhancements and upgrades.
Nostrand Ave Station Rehabilitation (Completed 01/2020)
Nostrand Avenue Station has received modernized station enhancements and upgrades.
Plainfield Avenue Bridge Modification (Completed 04/2020)
Plainfield Avenue Bridge is being modified to reduce truck strikes and improve infrastructure.
Port Jefferson Station Enhancement (Completed 03/2019)
Port Jefferson Station has received modernized station enhancements and upgrades.
Port Washington Substation Replacement (Completed 01/2019)
The Port Washington Substation has been replaced.
Positive Train Control (Completed 12/2020)
Positive Train Control is being integrated into LIRR infrastructure to enhance railroad safety.
Rockville Centre Viaduct Rehabilitation (Completed 11/2020)
The Rockville Centre Viaduct is being rehabilitated and repaired, including improvements to the existing drainage system.
Ronkonkoma Station Enhancement (Completed 3/2019)
Ronkonkoma Station has been modernized and improved.
Sandy Substation Restoration / Long Beach Branch (Completed 01/2018)
Replacement of three substations along the Long Beach Branch has been successfully completed.
School Street Grade Crossing Elimination (Completed 11/2020)
The School Street grade crossing is being eliminated to alleviate train and vehicular traffic and to increase safety.
South Tyson Avenue Bridge Modification (Completed 09/2019)
The South Tyson Avenue Bridge has been replaced to accommodate a new third track.
Springfield Boulevard Bridge Rehabilitation (Completed 8/2019)
The rehabilitated Springfield Boulevard Bridge will keep LIRR in a state-of-good-repair.
Stewart Manor Station Enhancement (Completed 01/2019)
Stewart Manor Station has been modernized and improved.
Stony Brook Station Enhancement (Completed 04/2019)
Stony Brook Station has received modernized station enhancements and upgrades.
Syosset Station Enhancement (Completed 06/2019)
Syosset Station has received modernized station enhancements and upgrades.
Urban Avenue Grade Crossing Elimination (Completed 09/2019)
Urban Avenue Grade Crossing Elimination – Completed September 2019
Valley Stream Station Enhancement (Completed 02/2019)
Valley Stream Station has received modernized station enhancements and upgrades.
Wantagh Station Platform Replacement (Completed 10/2018)
The $27 Million renovation project at Wantagh Station is finished.
Wyandanch Station Enhancement (Completed 09/2018)
Wyandanch Station has received modernized station enhancements and upgrades.