The Meadowbrook substation will be replaced to provide more reliable power to LIRR trains.
Merillon Avenue Substation Replacement
The Mineola substation, located at the southwest corner of Main Street and Front Street in Mineola, will be replaced as part of the LIRR Expansion Project.
Mineola Substation Replacement
The Mineola substation, located at the southwest corner of Main Street and Front Street in Mineola, will be replaced as part of the LIRR Expansion Project from Floral Park to Hicksville.
Morris Park Diesel Locomotive Shop (Completed 11/2020)
Morris Park Diesel Locomotive Shop is receiving upgrades to maximize efficiency.
Murray Hill Substation Replacement
The Murray Hill substation will be replaced to provide more reliable power to LIRR trains.
New Cassel Substation Replacement
The New Cassel substation will be replaced to accommodate the additional third track on the Main Line.
New Hyde Park Substation Replacement
The New Hyde Park substation will be replaced to accommodate the additional third track on the Main Line.
Ocean Avenue Substation Replacement
The Ocean Avenue substation will be replaced to provide more reliable power to LIRR trains.
Port Washington Substation Replacement (Completed 01/2019)
The Port Washington Substation has been replaced.
Positive Train Control (Completed 12/2020)
Positive Train Control is being integrated into LIRR infrastructure to enhance railroad safety.
Rosedale Substation Replacement
Rosedale substation will be replaced to provide more reliable power to LIRR trains.
Sandy Substation Restoration / Long Beach Branch (Completed 01/2018)
Replacement of three substations along the Long Beach Branch has been successfully completed.
Westbury Substation Replacement
The Westbury substation will be replaced to accommodate the additional third track on the Main Line.